Update #1

05/22/2024 at 3:34pm

Due to the severe storms in our area, the Data Center has transitioned the Primary Data Center B-Side electrical distribution to generator, to limit any potential for power fluctuations or outages. There was no impact to the compute floor. This was done in order to continue the following maintenance.

 

The Data Center along with vendor partners will be conducting life-cycle UPS battery replacement on the B-side UPS distribution starting Tuesday May 21st at 7am and running through Friday May 24th.

 

During this effort, the B-side distribution will be placed on utility power. A-side UPS systems and A&B generators will not be impacted by this effort. The Data Center is a fully redundant 2N facility designed for these efforts. No impact to compute systems is expected.